Skip to content

Can Greenjacket Guards be installed on energized equipment?

Yes, but there are the following conditions to keep in mind:
  • The feasibility of an energized installation can only be determined by our technicians during the Site Assessment. 
  • Only possible for guards that can be installed using accepted live-line methods in accordance with the safety standards of the Operating Authority and all applicable codes and standards of the regulatory agency.
  • Some equipment configurations do not allow for safe access and therefore cannot be considered for energized installation
  • Some Greenjacket guards may not accommodate certain live-line work methods because of their geometry or design. 

Feedback and Knowledge Base