Skip to content
Yes, but there are the following conditions to keep in mind:- The feasibility of an energized installation can only
be determined by our technicians during the Site
Assessment.
- Only possible for guards that can be installed using
accepted live-line methods in accordance with the safety
standards of the Operating Authority and all applicable
codes and standards of the regulatory agency.
- Some equipment configurations do not allow for safe
access and therefore cannot be considered for energized
installation
- Some Greenjacket guards may not accommodate certain
live-line work methods because of their geometry
or design.